Wilo-Drainlift M1 & Drainlift M2 - Sewage Lifting Plant

Sewage lifting plant for drainage of residential and commercial buildings

Type key Example:
M Sewage lifting plant for drainage of residential and commercial buildings
M1 = Single-pump plant
M2 = Double-pump plants
(1~) AC - 1~ 230 V, 50Hz
(3~) Three-phase current - 3~ 400v, 50hz
Quick Specs:

Applications

Sewage lifting plant for drainage of residential and commercial buildings (e.g. pubs, stores ect.) untreated sewage that cannot be fed to the public sewer system by gravity flow and sewage coming in from toilets below the backflow level must, according to the requirements of DIN EN 12056/DIN 1986-100, be fed to the public sewer system using an automatic lifting plant. Sewage contain petroleum oils or hazardous substances must be disposed of via an oil or petrol trap, those containing fats via a grease trap and those containing sand via a sand trap. For installations in which the feed to the lifting plant must be equipped with a second conveyor (Wilo-Drainlift M1 & DrainliftM2) with equivalent capacity, which switches on automatically when necessary (DIN EN 12050-1 A1)


Design:

Fully assembled, fully submersible sewage lifting plant
submersion height: 2m
submersion duration: 7days
with gas-tight and water-tight collection tank and buoyancy protection. Centrifugal pump with free-flow impeller.


Wilo DrainLift M1

Single-pump plant with AC or three-phase motor for automatic operation. Switchgear with Schuko or ECC plug, volt-free contact, built-in alarm, built-in battery for mains-independent operation.


Wilo DrainLift M2


Double-pump system with AC or three-phase motor for automatic operation (with automatic duty cycling, standby and peak load operation). Built-in double non-return valve requires only one pressure line connection. Switchgear with Schuko or ECC plug, volt-free contact, built-in alarm, built-in battery for mains-independent operation.


Options


Wilo-Drainlift M1 & DrainliftM2 model, switchgear with individual fault signal.


Scope of delivery


Fully assembled sewage lifting plant including switchgear/plug, curve cutter and installation and operating manual.

The Wilo-Drainlift M1 & DrainliftM2 are held in stock locally or our central stores which are available on same day or overnight delivery to meet customer requirements during and after completions of your project.

We have a proven track record of supplying, maintaining and servicing pumping stations and pumping equipment.

DOWNLOAD WILO DRAINLIFT SPECIFICATION SHEET HERE


Residential Customers

Commercial

Schools

Local Authority

Retail

Hotels

Resturants

New Building Developments

Industrial Estates

Call Our Sales Team Now: 020 8991 6650